Master Bath Project--Setting Tile--Shower Walls

Once the framing was done and the backer board installed, it was time to get rolling on the tile.  Randy and Tim wasted no time in making serious progress.  

Setting a board to support the large 12"x12" field tiles...

Now Setting the Travertine Tiles......



Checking level.....
Tim running the tile saw in the 30 degree heat of the day.....
Randy working up the wall.....
checking level again....and again....
Setting the soap shelf.....
Starting to add the accent tiles.....
Tim installing the border tiles. 


Randy finishing up with the rest of the moisture barrier/membrane...
And now that the first row of accent tiles has dried for 24 hours, the second set of diagonal tiles can start.....


Tim says it cold out there.....
Getting close now.....
All the diagonal tiles now in. 
Time to do the shower floor and tub enclosure. 