Monday, January 7, 2008

Foundation walls done!!

This was probably the most uneventfull pour that I have ever been on. We poured the two 8' sections first so that the bottoms of them would set up and we could hopefully avoid the dreaded "blowout". The ICF forms were so sturdy that not only did they hold up to the pressure, we didn't use any bracing except for where we needed to straighten a wall. Once we got the walls poured we had to break out the frost blankets and cover them all up again. I can't wait to be done with these damn things.




No comments: