Here's Kelly caulking all of the joints......
And as you probably already know, if you've been watching the blog from the beginning....I am allergic to insulation, it makes me itch. So Kelly once again has to step in.
Time for a test fit. We needed to set it in place to verify the supporting block thickness and we wanted to do it before we sealed the tile just in case we scratched something.
Back out with the tub to fabricate blocks and to seal the tile/grout. Kelly got it done in time for us to watch it dry. Lot's of hurry up and wait.
No comments:
Post a Comment