With the drain/waste/vent piping done for the master bathroom sinks, we were finally able to install the T&G on the entry and closet walls. The wood on the 45 degree wall in the closet turned out really nice and has a really fancy looking grain to it. That's a good thing to because that will be one of the first things you see when you walk in off of the deck.
Friday, July 25, 2008
Master Bathroom Sinks
Sunday was a busy day too. Once the laundry room project was wrapped up we went to work in the master bathroom. Kenny and Butch finished the T&G walls while I worked on installing the two sinks. First had to center the template, tape it down, trace it, then cut the hole. Repeat.....Here's a few pictures




With the drain/waste/vent piping done for the master bathroom sinks, we were finally able to install the T&G on the entry and closet walls. The wood on the 45 degree wall in the closet turned out really nice and has a really fancy looking grain to it. That's a good thing to because that will be one of the first things you see when you walk in off of the deck.
With the drain/waste/vent piping done for the master bathroom sinks, we were finally able to install the T&G on the entry and closet walls. The wood on the 45 degree wall in the closet turned out really nice and has a really fancy looking grain to it. That's a good thing to because that will be one of the first things you see when you walk in off of the deck.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment